A bold and luxurious 154 H-3 Modern House in Wapda Town phase 1 designed with clean geometric lines, warm wooden textures, and premium ambient lighting. This contemporary façade blends elegance with functionality, featuring double-height elements, stylish balconies, and a sophisticated front entrance that creates a strong architectural statement in Wapda Town phase 1 location.

  • Modern contemporary elevation with premium wood and textured stone finishes
  • Double-height front façade with elegant linear lighting details
  • Spacious car porch, glass balcony, and landscaped exterior for a luxury appearance
154 h3 modern house in wapda town phase 1
Site Progress
40%
Phase: 1st Floor Brickwork
Design & Site Visuals
Front ElevationApproved Design
Site PhotosLatest — Apr 2026
Roof parapet work
Masonry work
Brick stacking
Interior filling
Interior filling
Interior filling
Construction Progress
Phase Timeline
Foundation & DPC
Dec 2025
Completed
Ground Floor Structure
Jan – Mar 2026
Completed
First Floor Brickwork
Apr 2026 – ongoing
Completed
Roof Slab (First Floor)
Est. Jun 2026
Completed
Plaster & Finishing
Est. Sep 2026
Progress
Interior & Handover
Est. Dec 2026
Pending
Current Tasks
Foundation Concrete
Ground level
Done
Column Casting (GF)
8 columns complete
Done
Brick Masonry (1F)
100% done
Done
Plumbing Rough-in
Ground floor
done
Electrical Conduit
GF walls
Ongoing
Roof Slab Shuttering
First floor
Pending
External Plaster
Façade
Pending
Site Visit Notes
Field UpdatesChronological
17 Apr 2026
First floor brickwork in progress approx 40% overall work completed. Second floor columns and shuttering underway. Electrical conduit placement ongoing in GF walls. Plumbing rough-in for bathrooms in progress. Labour: 8 mistris + 5 helpers. On track.
Site Supervisor
05 Apr 2026
Ground floor brickwork completed. First floor slab casting done and curing in progress. Material delivery: 8,000 bricks received and stacked. Water supply connected to site.
Site Engineer
20 Mar 2026
Ground floor lintel casting completed. Column casting for first floor begun. DPC applied on boundary walls. 5,000 bricks received and stacked on site.
Site Engineer
28 Jan 2026
Foundation work completed. PCC laid. Column footings cast as per structural drawings. Site levelling done. Construction formally commenced Wapda Town Lahore.
Project Manager
Site photo

FAQs

The project is currently in the 1st Floor Brickwork ↗ phase, with approximately 40% of the overall work completed. Ground floor structure is fully done, and as of April 2026, first floor brickwork, plumbing rough-in, and electrical conduit placement are actively ongoing.

The estimated handover date is December 2026. Plaster and finishing work is scheduled for September 2026, followed by interior work and final handover by December 2026.

The front elevation features clean geometric lines, warm wooden textures, and premium ambient LED lighting. It includes double-height facade elements, a stylish glass balcony, a spacious double car porch, and a bold front entrance — creating a strong architectural statement in Wapda Town Phase 1.

The 154-H3 wapda town phase 1 project features premium quality construction, including high-grade materials, natural lighting, elegant interiors, and a modern double story layout with spacious, well-designed rooms for comfortable family living.

You can reach out directly via WhatsApp at +92 324 331 1311, or use the “For Detail Quotation” button on the project page to send a message and get a personalized quote.